4888 Airway Drive, Central Point

Serving Jackson and Josephine counties

Southern Oregon building solutions

Ready-to-Assemble Shed and Lean-To Kits

Ready-to-assemble building kits for hands-on customers.

Start with the right questions

A building kit for customers ready to do the assembly.

Ready-to-assemble kits are intended for hands-on customers who want Shed Guys building components and instructions with customer-managed assembly. Current kit directions include shed and lean-to styles based on the Basic model approach.

Available size, model, material, foundation, delivery, installation, and finish details are confirmed in the project proposal.

A practical fit for

Projects with a clear job to do.

  • Experienced do-it-yourself customers
  • Shed or lean-to projects
  • Sites that can receive and stage bundled materials
Who it is for and what it solves

Know what arrives and what remains your responsibility.

An RTA project works best when delivery, staging, tools, labor, base preparation, and assembly time are planned before ordering.

Important: RTA means customer assembled. Installation, tools, labor, site preparation, permits, and other work are not implied unless specifically included in the proposal.

01

DIY control

Manage the build schedule and assembly with your own capable crew.

02

Kit-based structure

Choose from available shed and lean-to kit directions.

03

Local support

Use the supplied instructions and contact information when questions arise during assembly.

Ready-to-assemble building kit bundled for delivery
What is included and what you choose

Confirm the kit, site, delivery, and crew.

01

Kit style

Review the available shed and lean-to kit options and their included components.

02

Prepared base

The customer must have a suitable, accessible placement and staging area ready for delivery.

03

Tools and labor

Plan the equipment, lifting, weather protection, skill level, and help required for assembly.

04

Optional upgrades

Available doors, windows, ramps, insulation, vents, and other kit options should be confirmed before ordering.

How the service works

A clear path for your rta kits project.

The exact sequence changes with approvals, site work, concrete, delivery, and the confirmed scope.

01

Walk the site

Review access, placement, grade, drainage, and the goals for the rta kits project.

02

Define the scope

Confirm the intended use, layout, options, responsibilities, and any material limitations.

03

Prepare and schedule

Coordinate approvals, site work, foundation needs, materials, and the construction sequence.

04

Build and review

Complete the approved work and review the finished scope with the local team.

Timing, cost factors, and preparation

Treat delivery day as the start of your build.

Materials need a safe drop location and a plan for protection, organization, and assembly.

  • Confirm what the kit includes and what the customer supplies.
  • Prepare a hard, accessible delivery and staging area.
  • Review instructions, tools, crew availability, and weather before starting.

Project cost and timing are shaped by size, site conditions, access, selected options, approvals, material availability, weather, and work performed by others. The proposal is the source for the final scope and expectations.

Building components and options for an RTA kit
Project-specific support

One local team can connect the moving pieces.

The current RTA range includes shed and lean-to directions, with an instruction manual and delivery details confirmed for the order.

Service area: Jackson and Josephine counties, including Central Point, Medford, Jacksonville, Grants Pass, Ashland, and surrounding communities.

Questions before you build

Answers specific to rta kits.

These questions cover decisions that are not fully answered elsewhere on the page.

No. RTA kits are intended for customer assembly unless a separate installation service is specifically included.

The current site identifies RTA shed and lean-to options. Availability and specifications should be confirmed when ordering.

You need an approved delivery route, a suitable hard staging area, the prepared base, tools, labor, and a plan to protect materials.

Some ramps, doors, windows, insulation, vents, and weatherproofing options may be available. Confirm compatibility before ordering.

Your project starts here

Let’s build the right thing.

Tell us what you need and we will help you find the right next step.